Zero Downtime Branch Office Setup

← Back to Insights

Branch Office Setup with Zero Downtime

Opening a new branch office is always a big undertaking, and one of our clients had an ambitious plan to relocate one of their interstate offices to a larger facility over a weekend. The goal was to have the new site's IT infrastructure – network, internet, servers – up and running by Monday with as little downtime as possible. The client's internal IT team handled much of the physical deployment, but they enlisted Vee Tech to assist with the network reconfiguration and to be on standby for any hiccups during the cutover.

Challenges on Moving Day

As the new office went live, a few challenges popped up. One issue was with connectivity to a file server back at head office – users at the new site couldn't access shared drives. We quickly diagnosed this as a VPN routing issue: a subtle misconfiguration in the firewall settings. In fact, the IP of the default gateway in the documentation was off by one (a simple typo in the network diagram). The client's IT manager reached out when he noticed the discrepancy.

As soon as it was pointed out, our engineer recognised the mistake: "That must be a typo. It should be .250, not .249 – well spotted. I'll update the document and guide you through correcting the gateway setting." This change was made in minutes and immediately restored access to the file server.

Meanwhile, we also helped the client activate new internet links and apply the correct network policies. Because this was essentially a site move, all the branch's essential services (Internet, VPN, VoIP phones) had to transition with minimal disruption. We had prepared configuration scripts based on the old site, adjusted for the new IP ranges. As the client powered up their firewall and switches, we were on a Teams call validating that everything came online properly – from testing VPN tunnels to ensuring Wi-Fi was operational for staff.

Successful Go-Live

Thanks to thorough planning and close collaboration, the new branch was fully operational on schedule. Monday morning, employees walked into the new office and connected as if nothing had changed – they had internet access, the core applications, and phone lines working seamlessly. Any minor issues (like that gateway typo) were resolved in real-time during the move.

We provided an "updated documentation pack" to the client's IT manager post-move, incorporating the fixes and any tweaks discovered during implementation. This means the next time they set up a site, they'll have an even more refined playbook to follow.

Outcome

The branch relocation was a success, with zero business downtime. The client credited the co-managed approach for this smooth outcome: their internal team handled on-site tasks and knew the company's needs, while Vee Tech's experts provided remote oversight, quick problem-solving, and the confidence that no technical issue would derail the timeline.

This story illustrates how even complex IT projects – like moving an entire office's IT in one weekend – can be executed with minimal disruption when you have the right support. It's about preparation, teamwork, and having experienced professionals ready to tackle the unexpected. In the end, the client's leadership remarked that customers and staff "barely noticed the move," which is the best compliment one can give to an IT relocation project.

Keys to Zero Downtime Migration

  1. Thorough Planning: Prepare configuration scripts and documentation well in advance
  2. Remote Support: Expert oversight during cutover catches issues immediately
  3. Real-Time Problem Solving: Quick diagnosis and resolution of unexpected issues
  4. Documentation Updates: Capture learnings to improve future deployments
  5. Team Collaboration: Internal team handles on-site work, external experts provide technical support

Best Practices for Office Relocations

  • Pre-Configure Equipment: Set up firewalls, switches, and network gear before moving day
  • Test Connectivity: Validate VPN tunnels and remote access before go-live
  • Have Backup Plans: Prepare for common issues like ISP delays or configuration errors
  • Update Documentation: Keep network diagrams and configuration guides current
  • Communicate Clearly: Ensure all stakeholders know the timeline and what to expect

Ready to plan your office relocation or branch setup? Contact Vee Tech to discuss how we can support your next IT project.